Skip to content Skip to navigation

Goulburn Valley Water

FAULTS & EMERGENCIES: 1800 454 500

Sewage Pump Station and Rising Mains

The documents, drawings and forms on this page are currently under review. Prior to proceeding with any Sewage Pump Station design work, the developer should discuss the proposed changes from the review with us.

For details about requirements that are not listed below, contact (e) mail@gvwater.vic.gov.au or (p) 1800 454 500.

Guidelines and Manuals

Sewage Pump Station Guidelines - under review, contact GVW

Sewage Pump Station Manual - under review, contact GVW

Standard Drawings

Standard Drawing: Sewage Contracts

Standard Drawing: Sewage Pump Station an Rising Main Pump Station Structural Details

Standard Drawing: Sewage Pump Station Handrail

Standard Drawing: Installation Pump Station Pump Well Ladder - under review, contact GVW

Standard Drawing: Footings and Rag Bolt Assembly for Vent Stack

Standard Drawing: Sewer Rising Main Non-Return Pit

Standard Drawing: Sewer Rising Main PVC detail of turn up at Point of Discharge

Standard Drawing: Sewer Rising Main PE detail of turn up at Point of Discharge

Standard Drawings for:

  • Pumping Station Arrangements; and 
  • Sewage Pump Station Layouts

are currently under development to incorporate requirements as prescribed in our Sewer Network Odour Management Strategy.

Standard Details

Standard Details: Sewer Rising Main Air Valve Assembly

Standard Details: Sewer Rising Main Scour Valve Assembly

Forms

Form: Sewage Pump Station or Rising Main Shutdown