Sewage Pump Station and Rising Mains

The following documents, drawings and forms outline our requirements to ensure designs and specifications comply with relevant standards for our sewage pump stations and rising mains. For details about requirements that are not listed below, contact mail@gvwater.vic.gov.au.

Guidelines and Manuals

Sewage Pump Station Guidelines

Sewage Pump Station Manual

Standard Drawings

Standard Drawing: Sewage Contracts

Standard Drawing: Sewage Pump Station and Rising Main Pump Station Structural Details

Standard Drawing: Sewage Pump Station Handrail

Standard Drawing: Installation Pump Station Pump Well Ladder

Standard Drawing: Footings and Rag Bolt Assembly for Vent Stack

Standard Drawing: Sewer Rising Main Non-Return Pit

Standard Drawing: Sewer Rising Main PVC detail of turn up at Point of Discharge

Standard Drawing: Sewer Rising Main PE detail of turn up at Point of Discharge

Standard Drawings for:

  • Pumping Station Arrangements; and 
  • Sewage Pump Station Layouts

are currently under development to incorporate requirements as prescribed in our Sewer Network Odour Management Strategy.

Standard Details

Standard Details: Sewer Rising Main Air Valve Assembly

Standard Details: Sewer Rising Main Scour Valve Assembly

Forms

Form: Sewage Pump Station or Rising Main Shutdown